top of page

dredging

Boulder head

Before trenching operations can start, a boulder clearing campaign can be required to avoid boulders ending on top of the product in the trench. Most of the time, this job will be executed by a plow and pulling vessel.

Boulder clearing with a TSHD instead of a plow-spread gives some important advantages:

  • higher working speed

  • higher flexibility in deployment

  • no extra mobilisation in case of trenching with the same TSHD

Boulderkop (NL).jpg

Design

The boulder head consists of a large plow-shaped structure that is connected to the dredgepipe by a fixed part. The plow has an inclination to one side, so that the boulders are pushed to one side. By sailing multiple passes in opposite direction, a corridor of any width can be achieved by the TSHD.

Anti-clogging elements are provided for the plow when working in sticky soil types.

bottom of page