OVERALL PRODUCTION RATE
Even if the separate elements of the production rate are maximized, the overall production rate can still be lifted as we always need to look at the big picture of a job. Many combinations can be found but the most common are:
​
  • even if the excavation production stays the same, extending the loading time can gradually raise the production in dense sand 
​
  • under other circumstances, extended loading times can create problems in clayey soils
​
  • overdepth dredging can be beneficial on one job and problematic on another
​
  • some soil types can not be dredged together but separately, or in a different order
​
​
What can we do for you in this case?
​
  • if datalog files are available: make a quick office-based assessment of the situation and possible improvements
  • go on board and look for the highest overall production rate by taking all the elements of the job into consideration: jobs specs, survey data, local circumstances and ships state and specs
  • Write a report about the initial situation and results of implementations on site
​